Master Plan

Sobha Seinna master plan & site layout

Sobha Seinna master plan covers 8.5 acres at Egattur, OMR, Chennai — three towers, 650 apartments, internal circulation and open space across a B+G+32 layout.

Land area
8.5 Acres
Towers
3
Floors
B+G+32
Units
650

Sobha Seinna master plan and site plan

Sobha Seinna master plan is the approved site layout for the 8.5-acre development at Egattur, OMR, Chennai, showing how three towers and 650 apartments are arranged. A master plan fixes everything a brochure image cannot: where each tower stands relative to the others, how vehicles enter and circulate, where parking sits, how much of the site stays open, and where the clubhouse and common facilities are placed. For a 32-floor development on 8.5 acres, those decisions determine daylight, privacy and outlook far more than any individual apartment layout does.

Indicative graphic only. The approved Sobha Seinna site layout will replace it once the developer publishes it.
Ask on WhatsApp
Site Planning

Master plan highlights

These are the site-level figures confirmed in the project information. Anything not listed here has not been published, and we do not estimate it.

8.5 AcresTotal land area
3Residential towers
B+G+32Building profile
650Total apartments
3 & 4 BHKConfigurations

Tower planning

Three towers to a B+G+32 profile. Tower naming, unit counts per tower, core layout and lift configuration are part of the official plan set and have not been released.

To be updated

Open space & landscape

The proportion of the 8.5-acre site left open, and how landscape is distributed between podium, ground level and setbacks, will be clear from the approved layout.

To be updated

Access, parking & services

Entry and exit points, internal driveways, basement parking provision and service areas are defined in the sanctioned plan. Details are not yet published.

To be updated

How to read the master plan when it is released

When the official layout for Sobha Seinna is published, a few things are worth checking before anything else.

  • Tower spacing. The distance between the three towers, and their orientation relative to each other, decides how much daylight and privacy a mid-floor apartment actually gets.
  • Which side your unit faces. On a corridor site, the difference between facing OMR and facing inward is significant for noise and outlook.
  • Where the clubhouse and amenity zones sit. Proximity is convenient; being directly adjacent is not always desirable.
  • Vehicular circulation. Where cars enter, where they park and how they move through the site affects the ground-level experience.
  • Setbacks and open area. These are governed by approved plans and are worth verifying against the sanctioned drawings rather than a marketing render.

We can walk you through each of these on the actual drawing once it is available, and point out what applies to the specific unit you are considering.

Get the master plan as soon as it is released

Leave your details and we will send the official site layout when the developer publishes it, along with the tower and unit position for your preferred configuration.

Request the site layout

Sobha Seinna is at pre-launch stage, so the sanctioned master plan is not yet in the public domain. Register your interest and we will share it directly once it is available, together with the current price position and unit availability.

  • Official site layout when released
  • Tower and floor options for your configuration
  • Current price and payment schedule

Request master plan

We will send it as soon as it is officially released.

We use your details only to respond to this enquiry.

FAQs

Master plan questions

Not yet. The project is at pre-launch stage and the approved site layout has not been released by the developer. We will publish it here once it is officially available.

The project occupies 8.5 acres at Egattur, OMR, Chennai.

Three towers are planned, each to a B+G+32 profile — one basement, ground floor and thirty-two upper floors.

650 residential units in total, in 3 BHK and 4 BHK configurations.

That figure has not been published. It will be verifiable from the sanctioned layout once the master plan is released, and we would rather wait for the drawing than estimate it.

Approved plans are filed with the relevant planning and real estate regulatory authorities. Once the project is RERA registered, the registered plan set and declarations should be verified from the authority's records.