Old Mahabalipuram Road

Featured Image of Old Mahabalipuram Road


Old Mahabalipuram Road, or OMR, is a 43.7 km state highway from Madhya Kailash in Chennai to Mahabalipuram. Its official name is Rajiv Gandhi Salai, and it carries the number SH 49A. People also call it the IT Expressway, as TIDEL Park, SIPCOT and many tech campuses line the route. Today, OMR is one of Chennai's busiest home-buying belts for IT staff and young families.

This guide covers the route, key areas, IT parks, metro work, property rates and the latest OMR news. Each section gives you facts you can use when you pick a home along the road.

OMR at a Glance


Detail Information
Official name Rajiv Gandhi Salai (SH 49A)
Start point Madhya Kailash, Adyar, Chennai
End point Mahabalipuram, Chengalpattu district
Length About 43.7 km
Road agency Tamil Nadu Road Development Corporation
Key IT hubs TIDEL Park, ELCOT SEZ Sholinganallur, SIPCOT IT Park Siruseri
Metro Line 3, Madhavaram to SIPCOT, under construction
Parallel roads East Coast Road to the east, GST Road to the west
Key areas Perungudi, Thoraipakkam, Sholinganallur, Navalur, Egattur, Kelambakkam

Where Does OMR Start and End?


OMR starts at the Madhya Kailash junction in Adyar, close to the IIT Madras campus. It then runs south past Taramani, Perungudi and Thoraipakkam into the main IT stretch. After Sholinganallur, the road passes Navalur, Egattur and Kelambakkam, where much of the new housing sits. Beyond Kelambakkam, it runs through Thiruporur and ends near Mahabalipuram, close to the East Coast Road. Planners split the corridor into two zones, Madhya Kailash to Sholinganallur and Sholinganallur to Kelambakkam.

How OMR Became Chennai's IT Corridor


Until the late 1990s, OMR was a narrow road through farmland, salt pans and small villages. The opening of TIDEL Park at Taramani in 2000 changed that, as tech firms began moving south. The state then widened the road and set up SIPCOT IT Park at Siruseri for larger campuses. In 2008, the stretch became a state highway and took the name Rajiv Gandhi Salai. Homes, schools, malls and hospitals followed the jobs, turning OMR into a full suburb within two decades.

Major IT Parks and Employers on OMR


OMR holds one of the densest clusters of tech offices in South India.

IT hub Area What you will find
TIDEL Park Taramani One of India's early large IT parks, with IT and BPO firms
ELCOT SEZ Sholinganallur A state-backed IT special economic zone
SIPCOT IT Park Siruseri About 780 acres of tech campuses, including a large TCS campus
Private tech parks Perungudi to Navalur Large campuses run by developers and global firms

Because jobs spread along the whole road, you can live close to work almost anywhere on OMR.

OMR Areas Compared: Prices and Rental Yield


Property rates on OMR fall steadily as you move south, which gives you a choice of budgets.

Locality Price per sq.ft Rental yield
Perungudi ₹10,000 to ₹11,500 4% to 6%
Thoraipakkam ₹7,500 to ₹9,500 3.5% to 4.5%
Sholinganallur ₹7,500 to ₹9,000 4% to 5%
Navalur ₹6,000 to ₹8,500 2% to 3%
Siruseri and SIPCOT ₹4,500 to ₹6,500 About 4%

These figures come from a 2026 Sobha market note, so treat them as broad guides. The same note reports OMR price gains of 35% to 48% in recent years, varying by locality. Branded new launches often quote above these averages, since buyers pay for larger homes and fuller amenities.

OMR Metro: Line 3 and What It Means for You


Chennai Metro Line 3 will run 45.4 km from Madhavaram in the north to SIPCOT 2 at Siruseri. On OMR, planned stations include Perungudi, Thoraipakkam, Sholinganallur, Navalur and the two SIPCOT stops. Estimates for OMR metro service range from 2027 to 2028, though some trackers expect full completion by 2030. Once it runs, you can reach Adyar, Mylapore and north Chennai without the daily OMR traffic. For buyers, this metro line is the biggest single upgrade OMR will see this decade.

Living on OMR: Schools, Hospitals and Daily Life


OMR now offers most of what a family needs within a short drive of home.

  • International and CBSE schools run along the corridor, from Sholinganallur down to Kelambakkam.
  • Chettinad Hospital at Kelambakkam and several large hospitals near Sholinganallur cover your medical needs.
  • Malls such as Marina Mall at Egattur and Vivira Mall at Navalur handle shopping and weekend outings.
  • The beaches and resorts of ECR sit just a few minutes east, linked by several link roads.

Traffic is the main drawback, especially near Sholinganallur junction and around metro work zones. You should test your office commute at peak hours before you choose a home.

OMR vs ECR: Which Road Suits You?


Many buyers compare OMR with the East Coast Road, which runs close by along the sea.

Point OMR ECR
Main draw IT jobs and new apartments Beach life and villas
Home types High-rise flats and gated towers Houses, villas and plots
Daily commute Short if you work in IT Longer for most office jobs
Weekend life Malls, cafes and parks Beaches and resorts

Most working families pick OMR for the commute and drive to ECR on weekends.

Who Should Buy a Home on OMR?


OMR is not one market, so the right stretch depends on your work, budget and family needs.

  • If you work at TIDEL Park or Perungudi, the northern stretch keeps your commute short.
  • If your office sits in Sholinganallur or Navalur, the middle stretch gives you good value and many choices.
  • If you work at SIPCOT or want a bigger home for your money, look at Egattur and Kelambakkam.
  • If you plan to rent out your flat, buy near a big IT park or a metro stop.

Before you book, walk the area after a heavy rain and check how fast the water drains. Ask the builder for the TN RERA number, the approved plan and the land title papers. These simple checks protect you far more than any brochure or sales pitch can.

Sobha Seinna on Southern OMR


The southern half of OMR, between Navalur and Kelambakkam, is where most large new projects now come up. Sobha Seinna by Sobha Limited is one such pre-launch project, located at Egattur on OMR. It plans 650 apartments in three B+G+32 towers on 8.5 acres, with 3 and 4 BHK homes. Sizes range from 1,750 to 2,700 sq.ft, and prices start from ₹1.69 Cr onwards.

The site sits inside the job belt, about 2 km from SIPCOT and 3 km from TCS Siruseri. So you can reach the largest IT park on OMR in minutes, even before the metro opens. The future SIPCOT metro stations should also sit close to the project once Line 3 is complete.

Milestone Date as per project website
Pre-launch opened 18 September 2026
Proposed launch 23 December 2026
Planned completion 10 December 2030
Proposed possession 20 December 2030
TN RERA Registration coming soon

Sobha has not yet released floor plans or a unit-wise price list, and TN RERA registration is pending. Visit the Sobha Seinna price page for the latest verified details shared by the project team.

Latest OMR News (October 2026)


These eight updates show what is changing on the corridor as you read this page.

  • In late September 2026, police shut three OMR U-turns near Geetham, BSR Mall and World Trade Centre. Commuters reported longer trips, since drivers now travel farther before turning.
  • From 1 to 5 September 2026, CMRL ran night diversions near TIDEL Park for sewer line repairs.
  • Metro Line 3 work continues along OMR, with service on the corridor expected between 2027 and 2028.
  • The first Phase 2 metro stretch, Poonamallee to Vadapalani, is set to open on 11 October 2026.
  • SIPCOT opened a ₹30 crore eco park at Navalur lake on its Siruseri campus in February 2026.
  • Sobha Seinna at Egattur entered pre-launch on 18 September 2026, adding a new branded project to southern OMR.
  • Anarock reported a 10% yearly fall in Chennai housing sales for July to September 2026.
  • Cheyyur, about 100 km south of Chennai, is now one of two shortlisted sites for a new airport.

FAQs


1. Where does OMR start and end?

OMR starts at Madhya Kailash in Adyar and ends near Mahabalipuram, covering about 43.7 km. It runs parallel to the East Coast Road for most of its length in the south.

2. Why is OMR called Rajiv Gandhi Salai?

The state renamed OMR as Rajiv Gandhi Salai when it became a state highway in 2008. People also call it the IT Corridor because of the many tech parks along the road.

3. Is there a metro on OMR?

Not yet, but Chennai Metro Line 3 is under construction along OMR up to SIPCOT at Siruseri. Current estimates put the start of OMR metro service between 2027 and 2028, subject to delays.

4. Which IT companies are on OMR?

Large firms such as TCS run major campuses at Siruseri, alongside many mid-size IT and back-office firms. Most offices sit in TIDEL Park, the ELCOT SEZ at Sholinganallur and SIPCOT IT Park.

5. Is OMR a good place to buy a home?

OMR suits you if you work in IT or want a newer, larger home near your office. Check flood history, traffic at peak hours and RERA status before you choose a project.

6. What new projects are coming up on OMR?

Sobha Seinna at Egattur is one of the newest, with 650 homes planned on 8.5 acres. It is in pre-launch, with the main launch planned for 23 December 2026.

Enquiry
Enquire Now